The Storyopen TwinUnit 50 Linked Twin-Module Mobile Home delivers a 50-square-metre family-scale residential floor plan through two factory-built 25-square-metre modules linked on site by a Storyopen-engineered steel connection frame and a purpose-designed junction wall system that produces a single-dwelling living environment indistinguishable from a single-module build once installed. The TwinUnit 50 is designed for families, multi-person households, and permanent residential buyers who require the space standards of a conventional 2–3 bedroom house in a relocatable format that can be delivered to virtually any accessible site in the UK without the planning permanence, construction time, or site infrastructure cost of a traditionally built dwelling.
Each of the two 25-square-metre modules is independently road-legal and transported separately on standard low-loaders, eliminating the wide-load permitting requirements that constrain larger single-module designs. The linking operation is completed by Storyopen’s specialist installation team in one working day on site, with the junction wall panels factory-prepared for rapid, weathertight connection that requires no wet trades or specialist on-site fabrication work. The completed twin-module delivers three bedrooms, an open-plan kitchen-dining-living area, a principal bathroom, and an en-suite shower room — a floor plan that meets or exceeds the spatial standards of a typical three-bedroom starter home across all room dimensions.
The SIP panel envelope across both modules achieves a consistent U-value of 0.16 W/m²K, and the linking junction is insulated and airtight-taped to the same standard as the module walls, eliminating any thermal or airtightness discontinuity at the join. The integrated electrical system spans both modules from a single 80A main incomer with a 20-way consumer unit, and the plumbing system is factory-configured for simple push-fit connection at the module junction — a design decision that reduces the on-site plumbing work to under two hours for a qualified plumber working from the provided connection diagram.
Storyopen includes a full site survey, groundwork specification, twin-module crane placement, electrical and plumbing interconnection, and a full post-connection commissioning and snagging inspection for every TwinUnit 50 installation. A 10-year structural warranty covers both modules and the linking structure.




Reviews
There are no reviews yet.